High-Performance Xuwei Top Drive 350 Drilling Machine for Efficient Operations

Product Details
Customization: Available
After-sales Service: Online Support
Warranty: 1 Year
Diamond Member Since 2024

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Importers and Exporters
The supplier has import and export rights
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Fast Delivery
The supplier can deliver the goods within 30 days
Standardized quality control
The supplier has a complete and standardized quality control process, check the Audit Report for more information
to see all verified strength labels (19)
  • High-Performance Xuwei Top Drive 350 Drilling Machine for Efficient Operations
  • High-Performance Xuwei Top Drive 350 Drilling Machine for Efficient Operations
  • High-Performance Xuwei Top Drive 350 Drilling Machine for Efficient Operations
  • High-Performance Xuwei Top Drive 350 Drilling Machine for Efficient Operations
  • High-Performance Xuwei Top Drive 350 Drilling Machine for Efficient Operations
  • High-Performance Xuwei Top Drive 350 Drilling Machine for Efficient Operations
Find Similar Products

Basic Info.

Model NO.
Xuwei Top Drive 350
Motor
DC Motor
Drill Hole Diameter
42-350mm
Drill Hole Depth
>200m
Bit Type
Diamond Bit
Drilling Way
Rotary
Type
Four-Wheel trailer
Rotating Speed
27-901rpm
Maximum Torque
10500nm
Power Head Stroke
3500mm
Power He Propulsion Force
60kN
Power Head Lifting Force
120kN
Transport Package
Container
Specification
6.5t
Trademark
xuwei
Origin
Linyi
HS Code
843041
Production Capacity
500 Units Per Month

Product Description


 
 350 Type P Water Well Drill Rig

This drilling rig is suitable for drilling projects such as water well drilling, general survey exploration, geophysical exploration, road and construction exploration and blast hole drilling.
YG series hydraulic water well drilling rig is mainly used for water wells, general geological research and exploration / core drilling, types of holes in concrete structures, roads and tall buildings exploration of foundations, river dikes, drilling of subgrade grout holes and direct grout, civil wells and earth central air conditioning temperature, etc.

Features:

1. It is an efficient and multi functional groundwater drilling equipment, which can be used for drilling water wells, agricultural
irrigation wells, geothermal wells and other wells.
2. The machine can drill holes in different formations (rock layers, mud layers, sand layers), and the maximum aperture can reach
300mm.
3. This machine adopts high-torque hydraulic motor power head and brand diesel oil, and the hydraulic control system adopts large-diameter hydraulic cylinder. The brand diesel is protected by a two-stage air filtration system, and the clean air from the air compressor can also be used directly.

4. Unique pump design and centralized control operating system are easy to maintain and operate.
 

Product Parameters


Drilling capacity

Drilling depth for water well
350m(152mm~203mm)
 75mm
Wireline coring N size
600m
()
Borehole (Drill bit) dia.
Ø75~Ø350mm
  
 Drilling angle
90°

Drive head
   
  Lifting capacity
120kN
    
Thrusting capacity
85kN

Rotary speed RPM
Forward rotation:27,51,93,129,156,193,247,437,737,901r/min
Reverse turn:48,219 r/min
 
 Max. Torque
10500N.m

Power Unit
 
Engine Model
YN27

Rated power/speed
58kW/ 2400r/min
 
 Mechanical winch capacity
5.5Ton

Drill pipe
  
 Drill pipe dia.
Ø50/ Ø60 / Ø76/ Ø89mm
NQ/ HQ /PQ
   
Drill pipe length
3000mm

Mud pump
BW160/ BW200/ BW250/BW320/BW450

Air compressor
   
Air consumption
16~35m3/min
 
 Air pressure
10.5~24.6bar

Crawler chassis
  
 Walking speed
0~2 km/h
  
 Climbing angle
Max. 25°~30°

Dimension
 
Transport
5600*2100*2600mm
  
Working
3800*2400*7600mm
 
Weight with steel crawler
6500kg
  

High-Performance Xuwei Top Drive 350 Drilling Machine for Efficient Operations
High-Performance Xuwei Top Drive 350 Drilling Machine for Efficient Operations
High-Performance Xuwei Top Drive 350 Drilling Machine for Efficient Operations
High-Performance Xuwei Top Drive 350 Drilling Machine for Efficient Operations

High-Performance Xuwei Top Drive 350 Drilling Machine for Efficient Operations

High-Performance Xuwei Top Drive 350 Drilling Machine for Efficient Operations
High-Performance Xuwei Top Drive 350 Drilling Machine for Efficient Operations
High-Performance Xuwei Top Drive 350 Drilling Machine for Efficient Operations


High-Performance Xuwei Top Drive 350 Drilling Machine for Efficient Operations


High-Performance Xuwei Top Drive 350 Drilling Machine for Efficient Operations
ShanDongxuweiMachinery
is a professional company engaged in research, development, production, sales,application
and service of air compressors and rock drill machines. The  products are widely used in
industry compressed air supply, mining and construction projects. With technology development as
the heart of company philosophy,Zhigao follows the guidelines of " detail oriented, high efficiency,
quality first and creating future" and the business philosophy of " Constant science and technology
innovations ". Xuwei is eyeing the global market and with confidence to strive to be world-class to
provide excellent products and services to customers.


High-Performance Xuwei Top Drive 350 Drilling Machine for Efficient Operations
1. Are you a trading company or a manufacturer?
We are a professional manufacturer. Our factory mainly produces water well drilling rigs, core drilling rigs, down-the-hole drilling rigs, pile drivers, etc. The products have been exported to hundreds of countries around the world and enjoy a high reputation all over the world.

2.How to inspect the goods?
1) Support customers to come to the factory for on-site inspection.
2) Support customers to designate third-party companies to inspect goods.
3) Support video inspection.


3.How long is your delivery cycle?
1) In the case of stock, we can deliver the machine within 7 days.
2) Under standard production, we can deliver the machine within 15-20 days.
3) In the case of customization, we can deliver the machine within 25-30 days.


4. What's your terms of payment?
T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and packages before you pay the balance.
 
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier