Basic Info.
Model NO. |
18-19 |
Exhaust pressure |
19 |
Volumetric flow rate |
18 |
Volumetric flow rate |
Yuchai |
engine |
191kw |
engine speed |
1900 |
External dimensions |
4404*1950*2296 |
yield |
500 Units Per Month |
High reliability. The main components are uniformly distributed by the group company and equipped with branded diesel engines, ensuring reliable operation of the entire machine.
The protection function is complete. The protection functions for high compressor discharge temperature, high diesel engine water temperature, and low diesel engine oil pressure are complete.
Strong adaptability. Ultra large cooler design, suitable for harsh outdoor working environments.
About the company
MengyinxuweiMachinery
is a professional company engaged in research, development, production, sales,application
and service of air compressors and rock drill machines. The products are widely used in
industry compressed air supply, mining and construction projects. With technology development as
the heart of company philosophy,Zhigao follows the guidelines of " detail oriented, high efficiency,
quality first and creating future" and the business philosophy of " Constant science and technology
innovations ". Xuwei is eyeing the global market and with confidence to strive to be world-class to
provide excellent products and services to customers.
FAQ
1. Are you a trading company or a manufacturer?
We are a professional manufacturer. Our factory mainly produces water well drilling rigs, core drilling rigs, down-the-hole drilling rigs, pile drivers, etc. The products have been exported to hundreds of countries around the world and enjoy a high reputation all over the world.
2.How to inspect the goods?
1) Support customers to come to the factory for on-site inspection.
2) Support customers to designate third-party companies to inspect goods.
3) Support video inspection.
3.How long is your delivery cycle?
1) In the case of stock, we can deliver the machine within 7 days.
2) Under standard production, we can deliver the machine within 15-20 days.
3) In the case of customization, we can deliver the machine within 25-30 days.
4. What's your terms of payment?
T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and packages before you pay the balance.